Building the Kaczor 6m                                                                          Page 1

Timber arrives & the mould frames are cut out.

Timber 

Mould Frames are set up on the strong back and levelled before being faired.

Frames Set Up

The laminated stem is positioned & Cedar planking begins.

Stem

The Planking is completed, the retaining screws are removed & holes filled.

Planking

A FRP fore foot is moulded over foam and fitted to the Cedar hull.

Bow Cone

After 2 layers of UD glass & much fairing, finally 2 coats of sprayed epoxy primer.

Epoxied

The moulded hull is turned over and loaded up for transport to a new home.

Moving 

The coach roof is moulded & 2 layers of UD glass applied.

Coach Roof 

Internal glass/epoxy in the bilge & forward frames bonded in place.

Forward Frames

Internal framework is nearly complete. 

Frames fitted

Photographs Page 2

Top    Back    Home